UC Santa Barbara
Category: Underground Distribution
Region: Southern California
City: Santa Barbara
State: CA
Architect:
Owner: Regents of the University of California
General Contractor: Helix Electric, Inc.
Summary: Install power and telecom ductbanks and manholes. Remove 4,160 volt building transformers and 5kV cable in conduit and manholes. Provide complete temporary power service (sound attenuated generator set, fuel, wiring, connections and alike) for buildings during power cutovers. Install building padmounted and dry-type transformers. Install padmounted switchgear, cable in ductbank system and terminate on switchgear and transformers. Coordinate, provide, and support testing of equipment and systems.