Statewide Electrified Fence Project
Category: Prisons
Region: Southern California
City: Jamestown and San Luis Obispo
State: CA
Architect:
Owner: Department of Corrections and the State of California
General Contractor: Helix Electric, Inc.
Summary: Two separate project sites: Sierra Conservation Center in Jamestown, CA and California Men's Colony in San Luis Obispo, CA. The scope of work includes construction of a total of 9,200 linear feet of electrifed perimeter fencing, power service cabinets, control cabinets, interlock panels, annunciator/graphic panels, programmable logic controller systems, back-up generators, modification of sallyports, modification of existing security fencing, concrete sidewalks, drainage improvements, relocation of tunnel ventilation shaft in San Luis Obispo, and residential-style family visting units.